This greenfield site near Al Mithnab was delivered end to end in open desert. Our teams excavated through deep sand, cast a reinforced raft with four tower pedestals, assembled the lattice structure on the ground and erected it by crane — then completed the equipment area, gravel yard and security fencing for handover.
Scope of work
- Bulk excavation in desert terrain and blinding concrete
- Reinforced raft foundation with four tower pedestals
- Concrete pumping, curing and bitumen waterproofing
- Ground assembly of the lattice tower sections
- Crane erection of the four-leg lattice tower
- Equipment cabinets, gravel yard and chain-link fencing
Every stage was delivered by Lavender’s own site teams under strict HSE and QA/QC practice, with inspection and sign-off before the next stage began.