In Makkah our civil team built the foundations for a new monopole telecom site inside a busy urban plot. Work was carried out behind safety barriers, with every stage — reinforcement, formwork and concrete — checked before the next began, ready for the monopole to be lifted into place.
Scope of work
- Excavation and site preparation behind safety barriers
- Double-layer reinforcement mesh for the raft foundation
- Anchor-bolt and pedestal reinforcement cages
- Timber formwork, concrete pouring and curing
- Foundation waterproofing
- Monopole lifting and erection
Every stage was delivered by Lavender’s own site teams under strict HSE and QA/QC practice, with inspection and sign-off before the next stage began.