Lavender built two monopole telecom sites within Al Mithnab’s residential districts. Each site was hoarded off for safety, excavated and given a reinforced raft and pedestal foundation with anchor bolts. After waterproofing, backfilling and compaction, the monopoles were erected by crane and the sites were completed with fencing and equipment.
Scope of work
- Site hoarding and excavation in built-up areas
- Reinforced raft and pedestal foundations with anchor bolts
- Concrete casting, curing and bitumen waterproofing
- Backfilling and layer-by-layer compaction
- Crane erection of monopole sections
- Chain-link fencing, equipment cabinets and power
Every stage was delivered by Lavender’s own site teams under strict HSE and QA/QC practice, with inspection and sign-off before the next stage began.