On a constrained city plot in Makkah, our team delivered a monopole site from deep excavation to a fully equipped installation. The foundation combines a reinforced raft with a tall pedestal and a protective retaining wall, all waterproofed before the monopole, shelter equipment and fencing were installed.
Scope of work
- Deep excavation and reinforced raft foundation
- Pedestal and column reinforcement cages
- Formwork for raft walls and pedestal
- Bitumen waterproofing of all buried concrete
- Monopole erection
- Equipment, generator and chain-link fencing
Every stage was delivered by Lavender’s own site teams under strict HSE and QA/QC practice, with inspection and sign-off before the next stage began.