High in the mountains of Dhahran Al Janub, our civil team built tower foundations on steep, rocky ground. The design uses isolated footings with tall pedestals linked by tie beams, built in stages on the slope with formwork, reinforcement and waterproofing at every step.
Scope of work
- Rock excavation on steep mountain terrain
- Isolated footings with reinforced pedestals
- Tie beams and anchor templates
- Formwork and concrete casting in stages on the slope
- Bitumen waterproofing of foundations
Every stage was delivered by Lavender’s own site teams under strict HSE and QA/QC practice, with inspection and sign-off before the next stage began.